kitchen
Project Status: 5% complete
Completed Items: installed new fridge and stove;
installed cable
Punch List: replace counter tops and backsplash;
replace or resurface sink; strip and repaint cabinets; tear out linoleum;
refinish hardwood floors; replace cabinet hardware; install glass doors on
built-in; install ventilation through floor duct; install pot rack;
install organizational units in cabinets; paint walls and ceiling |