bathroom
Project Status: 20% complete
Completed Items: removed bathtub surround; removed
vinyl tiles; installed two-thirds of ceramic floor tiles; wired and
installed outlet
Punch List: remove tub (temporarily) and resurface;
relocate tub plumbing; finish floor tiling; install bead board
wainscoting; install missing baseboard trim; install ventilation fan;
paint; reinstall tub; install period tub and shower fixtures; replace sink
and faucet; replace light fixture |